Involved in charging infrastructure as early as the design phase. Through thoughtful positioning and optimal power distribution, vehicles can be delivered with full batteries without impacting daily operations.

Even before the building was constructed, NL Mobility was involved in the design and realization of the charging infrastructure by Van Mossel’s project management. Nine Ecotap AC 22 kW duo charging stations, a duo AC wall charger and a DC 60 kW fast charger were realized at this location.

The positions of the power cables were accurately determined at an early stage, at a site that was then still under rough construction. This allowed the charging points to be placed in exactly the right places upon completion, without any subsequent adjustments.

Through early coordination, we were able to advise on the optimal arrangement of the charging points, the configuration of the transformer station and the reservation of appropriate transmission capacity with the grid operator. This allows Van Mossel to deliver all Vans & Trucks sold with full batteries, while leaving enough power available for daily operations.

Share project

Working at
NL Mobility

We are growing fast and are looking for people to help build.

More projects:
  • Hannover Airport DC1, Langenhagen

    Location:

  • HelloFresh, Nieuwegein

    Location:

  • Hilton Hotel, Leiden

    Location:

  • Van Mossel Mercedes-Benz, Dordrecht

    Location:

  • CEVA Logistics, Waalwijk

    Location: