Installing cable routes and distributors

Reliable charging infrastructure hinges on the underlying power distribution. NL Mobility designs and realizes cable routes and distribution facilities that perform under peak loads and meet all standards.

Strong basis for power and availability

Civil and electrical construction in one hand

We determine the route and cross-section of cables, realize trenching, drilling and casing, and install distribution boxes with the right protections and selectivity. By including thermal load, voltage drop and future expansion, we prevent bottlenecks and unnecessary excavation afterwards.

  • Execution of earthwork, drilling and installation of cable trays/cable ducts

  • Distribution and sub-distributions with proper protection, ground fault and selectivity

  • Documentation of sections and as-built drawings for management and expansion